For health, better working environment and sustainability!
A major investment to improve the working environment was completed in August 2024. This involved the installation of direct air extraction above all our vulcanising machines. This extraction system, thanks to a fully automatic control system, monitors which machines are running and adjusts the required air volume accordingly.
Since the system was introduced, the air quality in the production hall has improved considerably, and the temperature is also more comfortable.

The extraction system was designed to be able to use the extracted waste heat for heating the offices via a future heat exchanger, which is in line with our values.
Egy projekt, három cél: egészség, munkakörnyezet, fenntarthatóság. Így kell ezt csinálni.